Superheater and Economizer Supply and Installation
Eti Maden İşletmeleri Genel Müdürlüğü
16 March 2020
210 gün
For the Eti Maden Bandırma Boron and Acid Plants, the work included procurement of finned tubes and components, fabrication and installation, and integration with the existing system. The published project description records TIG welding, radiographic inspection and hydrostatic testing of each exchanger assembly at 85 bar.
Related category Economizers
