STORAGE TANKS
 
BENZOL TOWER OF SEPERATION
 
JET PULSE BAG FILTER
 
SANTIRFUJ FANS
 
PENSTOCK and ADDITIONAL EQUIPMENTS
 
ELBOW MANUFACTURING
 
STEEL CONSTRUCTION
 
HEATING EQUIPMENT
PRESSURE VESSELS
CEMENT SILO
 
   STEEL CONSTRUCTION
Description: Structural Steel Fabrication and Erection

Capacity: 100 ton-150 ton / month

Material: NPI & NPU-St 37.2

Paint: Epoxy Paint (airless)

Warranty: 2 years

     • Steel Construction

    • Steel Roof

    • Steel Construction

    • Discovery, Design and Project

    • Research and Cost Analysis.

    • Supply and Site Installation.

    • Production and Installation of Steel Construction.

    • Turnkey Projects.

Highslide JS
 

KARDEMİR KARABÜK DEMİR ÇELİK – NEW IN BLAST FURNACE PROJECT FOR USE IN MANUFACTURING templates ANKARAJ – KARABUK

Kardemir Karabuk New Blast Furnace Project Templates in the manufacture and monatjı Ankaraj

Technical Data :

Material : NPU100 - L80

Welding Process : MIG

Productions were done according to the project.

Assembly to be delivered to the administration made​​.

Photos

Highslide JS      Highslide JS      Highslide JS     
 

KARDEMİR KARABÜK DEMİR ÇELİK – END COOLING TOWER CONSTRUCTION STEEL FABRİCATİON-75 TONS – KARABUK

Kardemir Karabuk New Coke Plant Cooling Tower construction site of the 3-Piece Steel Construction Manufacturing

Technical Data:

Material : 340-300 HEP, IPE, UPN, Baklamalı Sheet

Welding Process : MIG

Sandblasting and Painting : Acrylic Polymer Shock primary over

Manufacture and installation of stairs and rails.

Assembly to be delivered to the administration made​​.

Photos

Highslide JS      Highslide JS      Highslide JS
 

ITC KA ENERGY - Digester FRONT AND SIDE POWER SUPPLY TANK MANUFACTURING - ANKARA

Itc Trade established by Turkey to obtain garbage atıkarından gas production project, 12 teams Digester Tank

Technical Data:

Gas Input – Output: DN 600 PN 10

Aspect : 1720 x 4300mm

Material Type : S235JR

Welding Process : Electricity Supply and Gas Metal Arc

Painting : Airless Applied Surface Primer

Photos

Highslide JS      Highslide JS      Highslide JS
 

KARABÜK IRON & STEEL - KARDEMİR - KAM POWER TECHNO.

Project: TAR Decanter Tank Manufacturing

Diameter: 8500 mm

Height: 7500 mm

Material: S235JR

Welding Test: RT, PT

Photos

Highslide JS      Highslide JS      Highslide JS
 

SANTES INCINERATOR – ANKARA

Project: Northern Iraq Waste Treatment Rotary Kiln Works Construction and Submerged Arc Welding Automation System

Photos

Highslide JS      Highslide JS      Highslide JS
 

ITC INVEST TRADING & CONSULTING A.G. - PROJECT Mamak Garbage

200 Tons of Steel Construction Manufacturing

Roof Spring Production

Scarecrow Productions

Mechanical Works

Photos

Highslide JS     Highslide JS     Highslide JS
 

Bolu Izzet Baysal University - Seyrani ERDEM

Convention Center Steel Construction Works

Indoor Sports Hall Roof Scissor Productions

University Entrance Steel Door Manufacturing

Photos

Highslide JS     Highslide JS     Highslide JS
 

ITC COMPANY - PROJECT Mamak Garbage

Miscellaneous Steel Productions

Tower Water Tank Productions

Photos

Highslide JS     Highslide JS     Highslide JS
 

CENGİZ HOLDING MINE FACTORY - BEAM PRODUCTION

Beam Fabrication - Column Production

Welding Process: Submerged Arc Welding Process

Preheating: 100 ˚ C

Materials The upper flange

Lower flange: 20mm - strut: 40mm

Paint: Epoxy paint and airless application

Highslide JS     Highslide JS     
 

ETI COPPER INC. - SELÜL UPPER TRANSPORTATION GUTTER

Selül upper Carrying Gutter

Welding Process: Gas Metal Arc Welding

Material: S355JR

Flange Thickness: 15mm - strut: 10mm

Paint: Epoxy paint and airless application

Photos

Highslide JS     Highslide JS     Highslide JS

 

Erensan HEAT AND MACHINERY - BUNKER POPPERS

Photos

Highslide JS     Highslide JS     Highslide JS
KARDEMİR KARABÜK DEMİR ÇELİK – NEW IN BLAST FURNACE PROJECT FOR USE IN MANUFACTURING templates ANKARAJ – KARABUK

ITC KA ENERGY - Digester FRONT AND SIDE POWER SUPPLY TANK MANUFACTURING - ANKARA

KARDEMİR KARABÜK DEMİR ÇELİK – END COOLING TOWER CONSTRUCTION STEEL FABRİCATİON-75 TONS – KARABUK

GEMİKAYA MMC ENERGY ROAD WATER - POWER PLANT CONSTRUCTION BİLEV HPP

HPP Penstock Construction Manufacturing - Nakhchivan / AZERBAIJAN

Manufacturing Facilities

Pipe Inner Diameter: ø1700mm

Thickness: 18-22mm

Pipe Sizes: 12mt.

Manufacturing and Resource UTU (Utraviole) and crack control

400 tons
Firmamız ISO 9001:2000 Kalite belgesine haiz imalat yapmaktadır.